At 19:55 UTC on July 12th, a containment breach occurred at Site-96. The primary anomaly, designated as SCP-XXXX, exhibited anomalous levels of aggressiveness, breaching its designated holding chamber. Initial reports indicate that a few personnel were exposed during the incident. Security protocols were immediately engaged, and the situation is currently being mitigated by Mobile Task Force Omega-7. Further details will be released pending a comprehensive investigation.
- Damage assessment is ongoing.Security footage of the incident has been recovered for analysis.The cause of the breach is currently unknown.
Logs from Site-96 - Subject Epsilon-07
Epsilon-07's behavior continue to be unpredictable. Review of the latest logs reveals a period of intense transmission followed by a sudden, unexplained silence. The subject's physical form displayed notable check here modifications during this period, notably a brightening of its dermal structure. Further monitoring is required to determine the cause of these occurrences.
- Possible hazards remain elevated.
- Safety measures are to be maintained.
- Personnel should demonstrate utmost caution when interacting with the subject.
Authorized Sector Alpha, Site 96
Access approved to Secure Sector Alpha, Site 96. The request has been scrutinized and verified. Please proceed to the designated reception point for confirmation of your credentials. Once authenticated, you will be granted access to the classified area. Adhere to all guidelines and report any anomalous activity immediately.
Personnel Guidelines for Site 96
This document constitutes the current iteration v3.1 of the Site 96 Personnel Handbook. It provides the procedures governing conduct and behavior for all personnel assigned to Site 96. All personnel should familiarize themselves with this handbook's regulations. Failure to comply by these standards may result in disciplinary action, up to and including revocation of assignment.
Site 96 operates under strict measures to ensure the integrity and safety of its mission. All personnel should emphasize these concerns in their daily duties.
- Peruse this handbook thoroughly.
- Reach out to your supervisor if you have any concerns regarding its information.
- Verify receipt of this handbook by annotating the attached form.
Termination Protocol for Anomaly Designation: Keter (Site 96)
In the circumstance of an anomaly designated as Keter at Site 96, immediate and stringent protocols are to be executed. The primary objective is the neutralization of the anomaly, minimizing risk to personnel and the surrounding environment. A multi-layered plan will be employed, undertaking with a full isolation of Site 96. Research Teams are to be allocated as necessary, prioritizing the suppression of the anomaly. On-Site monitoring and analysis will be conducted by the on-site research team, with a focus on categorizing the anomaly's nature. In the event of an breach, contingency plans are in place to contain personnel and restrict the affected area.
Report on Recovery Mission at Site 96|
This report outlines the progress of the retrieval operation conducted at Site 96 on date. The primary objective of the mission was to extract a designatedsample. Following a thorough preparation phase, a team of qualified personnel deployed to the site.
Challenges encountered during the operation included intense site circumstances. Despite these difficulties, the team adequately fulfilled its mission.
- Notable observations: The retrieval operation resulted in the procurement of the designated sample in fair state.
- Future considerations: Following a thorough analysis of the retrieved item, additional research and exploration will be undertaken to shed light on its attributes.